The Simandou Iron Ore Project is open pit mine is located in the southeastern part of Guinea contains significant high-grade iron ore, representing one of the largest and highest-quality ore reserves in the world. Simandou contains 4.6+ Bt of high-grade iron ore for WCS (resource) & SimFer (resources and reserves) grading 65.5% Fe, positioning it as a major future source of global seaborne iron ore supply.
The project is divided into four blocks:
- Blocks 1 & 2: Developed by Winning Consortium Simandou (WCS), owned by the Government of Guinea (15%), Winning Consortium (42.5%), and Baowu (42.5%). Simandou Blocks 1 & 2 are owned by Winning Consortium Simandou (WCS). the deposit is estimated to contain ~2.7 Bt of Mineral Resources and ~1.8 Bt of Ore Reserves grading 65.5% Fe.
- Blocks 3 & 4: Developed by SimFer, a joint venture owned by the Government of Guinea (15%) and SimFer Jersey (85%), which is jointly held by Rio Tinto (53%) and the CIOH Consortium (47%). The project contains 1.499 Bt of Ore Reserves and 1.36 Bt of Mineral Resources, supporting a 26-year mine life. Life-of-mine operating costs are estimated at US$10/wmt (mine gate), with sustaining capital expenditure of approximately US$1/wmt.
The Simandou project officially commenced operations on 11 November 2025 and, upon full ramp-up, is expected to supply 120 Mtpa of high-grade iron ore to the seaborne market, with 60 Mtpa from WCS-operated Blocks 1 & 2 and 60 Mtpa from SimFer-operated Blocks 3 & 4. Following the completion of the rail and port infrastructure, SimFer operation is expected to reach its 60 Mtpa production capacity within 30 months, with full output targeted by 2028.
Source: Rio Tinto; UBS Global Research & Evidence Lab